...installation of the all the cables to the RIP Board assembly and to the Printhead assembly; J2, J3, and J4 on the RIP Board. Go to ?RIP Board? on page 5-11. If the cables are connected correctly ...
...a failure in the HYSNC signal to the printhead. Check the continuity of the cables connected to J3 and J8 on the engine board. If incorrect, replace the defective cable. The voltage at J8-4 ...
...board cable or engine board itself. Check the continuity of the mirror motor cable connected to J3 on the engine board. If incorrect, replace the cable. The voltage at J3-7 measures approximately
Usually answered in minutes!
1,487 Questions
1,353 Questions
1,277 Questions
961 Questions
741 Questions