1999 Chevrolet C1500 Logo

Related Topics:

A
Anonymous Posted on Dec 09, 2013

2000 Chrysler 300 M 3.5 liter engine head intake and exhaust torque sequence values and specifications

Need head installation procedures Chrysler 300 M torque sequences and values intake exhaust manifold and head

5 Related Answers

Anonymous

  • 55 Answers
  • Posted on Mar 14, 2009

SOURCE: Torque Spec for '99 Chevy C1500 5.7L engine lower intake manifold

On 5.7L engines, install the bolts and torque in sequence as follows:

  1. Step 1: 71 inch lbs. (8 Nm).
  2. Step 2: 106 inch lbs. (12 Nm).
  3. Step 3: 11 ft. lbs. (15 Nm).
f2266b6.jpg

Ad

Anonymous

  • 3640 Answers
  • Posted on Sep 07, 2010

SOURCE: i need the engine torque specs for 99 chevy malibu

99 chevy malibu v6 3.1 engine, head bolt torque is-- 98 through 2001 is step1- 37 foot lbs, step 2- rotate an additional 90 degrees (1/4 turn). the rocker arm bolts are 168-in. lbs.

ZJLimited

ZJ Limited

  • 17989 Answers
  • Posted on Sep 14, 2010

SOURCE: what is the proper cylinder head torque value and

For 2003 Chevrolet Truck Trailblazer 4.2L SFI DOHC 6cyl tighten the cylinder head bolts in sequence as follows:

  1. Tighten the long bolts (1-14), in sequence, to 30 ft. lbs. (40 Nm).
  2. Tighten the long bolts, in sequence, an additional 90 degrees.
  3. Tighten the long bolts, in sequence, an additional 60 degrees.
  4. Tighten the 2 long end bolts to 15 ft. lbs. (20 Nm).
  5. Tighten the 1 short end bolt to 13 ft. lbs. (18 Nm).

bd45748.jpg

Fig. Cylinder head bolt tightening sequence-4.2L engine (click for zoom).


Hope this help to solve it.

ZJLimited

ZJ Limited

  • 17989 Answers
  • Posted on Oct 05, 2010

SOURCE: intake manifold torque specs and

8ef3de6.jpg

Fig. Exploded view of the upper and lower intake manifold and fasteners

- Position the rocker arms in their original locations and tighten to the proper specifications.

- Install lower the intake manifold attaching bolts. Apply sealant or equivalent thread locking compound to the threads of bolts. Tighten the vertical bolts first, then the diagonal bolts to 115 inch lbs. (13 Nm).

- Install the upper intake manifold and tighten the mounting bolts to 18 ft. lbs. (25 Nm).

Hope helps (remember to rate this).

ZJLimited

ZJ Limited

  • 17989 Answers
  • Posted on Dec 08, 2010

SOURCE: What is the torque specifications and sequencing

zjlimited_198.jpg

Fig. 1: Intake manifold installation-4.3L engines (click over image for zoom)


zjlimited_200.jpg

Fig. 2: Intake manifold bolt tightening sequence-1996-98 4.3L engines

Install the bolts and tighten in sequence and in 3 steps as follows:

  1. First step to 26 inch lbs. (3 Nm).
  2. Second step to 106 inch lbs. (12 Nm).
  3. Final step to 11 ft. lbs. (15 Nm).

Hope this helps (remember to rate this answer). Good luck.

Ad

Add Your Answer

×

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

0helpful
1answer

Please can you help with all the torque settings for the cylinder head on Hyundai Accent 1.5 1995"

Nissan Frontier, Xterra 1998-05

Torque Specifications


Fig.
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine Displacement Liters (cc) Engine ID/VIN Cylinder Head Bolts Main Bearing Bolts Rod Brearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Lug Nuts Intake Exhaust 1998 2.4 (2389) KA24DE
1A Step 1: 22 ft. lbs.
2B 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3
4C The cylinder heads and the lower intake manifold are installed together
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine Displacement Liters (cc) Engine ID/VIN Cylinder Head Bolts Main Bearing Bolts Rod Brearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Lug Nuts Intake Exhaust 1999 2.4 (2389) KA24DE 3.3 (3277) VG33E
1A Step 1: 22 ft. lbs.
2B 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3
4C The cylinder heads and the lower intake manifold are installed together
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine Displacement Liters (cc) Engine ID/VIN Cylinder Head Bolts Main Bearing Bolts Rod Brearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Lug Nuts Intake Exhaust 2000 2.4 (2389) KA24DE 3.3 (3277) VG33E
1A Step 1: 22 ft. lbs.
2B 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3
4C The cylinder heads and the lower intake manifold are installed together
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine Displacement Liters (cc) Engine ID/VIN Cylinder Head Bolts Main Bearing Bolts Rod Brearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Lug Nuts Intake Exhaust 2000 3.3 (3277) VG33E
1A The cylinder heads and the lower intake manifold are installed together
2B 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3C Step 1: Tighten the cylinder head bolts to 22 ft. lbs.
4D Step 1: Tighten the connecting rod bearing bolts to 10-12 ft. lbs.
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine ID Engine Displacement Liters Cylinder Head Bolts Main Bearing Bolts Rod Bearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Oil Pan Drain Plug Intake Exhaust 1998 KA24DE
1- Step 1: 22 ft. lbs.
2- 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3- The cylinder heads and the lower intake manifold are installed together
4- 10-12 ft. lbs. +60-65 degrees
5- Step 1: 72 ft. lbs.
6- Step 1: bolts 11-22 19 ft. lbs.
7- Step 1: 20 ft. lbs.
8- Step 1: 31 ft. lbs.
9- 83 inch lbs.
10- Stud bolt: 11 ft. lbs.
11- Step 1: 72 ft. lbs.
12- Bolts: 17-24 (M8) 16 ft. lbs.
13- Step 1: 33 ft. lbs.
14- Intake manifold collector:
15- Intake manifold:
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine ID Engine Displacement Liters Cylinder Head Bolts Main Bearing Bolts Rod Bearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Oil Pan Drain Plug Intake Exhaust 1999 KA24DE VG33E
1- Step 1: 22 ft. lbs.
2- 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3- The cylinder heads and the lower intake manifold are installed together
4- 10-12 ft. lbs. +60-65 degrees
5- Step 1: 72 ft. lbs.
6- Step 1: bolts 11-22 19 ft. lbs.
7- Step 1: 20 ft. lbs.
8- Step 1: 31 ft. lbs.
9- 83 inch lbs.
10- Stud bolt: 11 ft. lbs.
11- Step 1: 72 ft. lbs.
12- Bolts: 17-24 (M8) 16 ft. lbs.
13- Step 1: 33 ft. lbs.
14- Intake manifold collector:
15- Intake manifold:
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine ID Engine Displacement Liters Cylinder Head Bolts Main Bearing Bolts Rod Bearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Oil Pan Drain Plug Intake Exhaust 2000 KA24DE VG33E
1- Step 1: 22 ft. lbs.
2- 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3- The cylinder heads and the lower intake manifold are installed together
4- 10-12 ft. lbs. +60-65 degrees
5- Step 1: 72 ft. lbs.
6- Step 1: bolts 11-22 19 ft. lbs.
7- Step 1: 20 ft. lbs.
8- Step 1: 31 ft. lbs.
9- 83 inch lbs.
10- Stud bolt: 11 ft. lbs.
11- Step 1: 72 ft. lbs.
12- Bolts: 17-24 (M8) 16 ft. lbs.
13- Step 1: 33 ft. lbs.
14- Intake manifold collector:
15- Intake manifold:
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine ID Engine Displacement Liters Cylinder Head Bolts Main Bearing Bolts Rod Bearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Oil Pan Drain Plug Intake Exhaust 2001 KA24DE VG33E
1- Step 1: 22 ft. lbs.
2- 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3- The cylinder heads and the lower intake manifold are installed together
4- 10-12 ft. lbs. +60-65 degrees
5- Step 1: 72 ft. lbs.
6- Step 1: bolts 11-22 19 ft. lbs.
7- Step 1: 20 ft. lbs.
8- Step 1: 31 ft. lbs.
9- 83 inch lbs.
10- Stud bolt: 11 ft. lbs.
11- Step 1: 72 ft. lbs.
12- Bolts: 17-24 (M8) 16 ft. lbs.
13- Step 1: 33 ft. lbs.
14- Intake manifold collector:
15- Intake manifold:
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine ID Engine Displacement Liters Cylinder Head Bolts Main Bearing Bolts Rod Bearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Oil Pan Drain Plug Intake Exhaust 2002 KA24DE VG33E VG33ER
1- Step 1: 22 ft. lbs.
2- 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3- The cylinder heads and the lower intake manifold are installed together
4- 10-12 ft. lbs. +60-65 degrees
5- Step 1: 72 ft. lbs.
6- Step 1: bolts 11-22 19 ft. lbs.
7- Step 1: 20 ft. lbs.
8- Step 1: 31 ft. lbs.
9- 83 inch lbs.
10- Stud bolt: 11 ft. lbs.
11- Step 1: 72 ft. lbs.
12- Bolts: 17-24 (M8) 16 ft. lbs.
13- Step 1: 33 ft. lbs.
14- Intake manifold collector:
15- Intake manifold:
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine ID Engine Displacement Liters Cylinder Head Bolts Main Bearing Bolts Rod Bearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Oil Pan Drain Plug Intake Exhaust 2003 KA24DE VG33E VG33ER
1- Step 1: 22 ft. lbs.
2- 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3- The cylinder heads and the lower intake manifold are installed together
4- 10-12 ft. lbs. +60-65 degrees
5- Step 1: 72 ft. lbs.
6- Step 1: bolts 11-22 19 ft. lbs.
7- Step 1: 20 ft. lbs.
8- Step 1: 31 ft. lbs.
9- 83 inch lbs.
10- Stud bolt: 11 ft. lbs.
11- Step 1: 72 ft. lbs.
12- Bolts: 17-24 (M8) 16 ft. lbs.
13- Step 1: 33 ft. lbs.
14- Intake manifold collector:
15- Intake manifold:
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine ID Engine Displacement Liters Cylinder Head Bolts Main Bearing Bolts Rod Bearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Oil Pan Drain Plug Intake Exhaust 2004 KA24DE VG33E VG33ER
1- Step 1: 22 ft. lbs.
2- 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3- The cylinder heads and the lower intake manifold are installed together
4- 10-12 ft. lbs. +60-65 degrees
5- Step 1: 72 ft. lbs.
6- Step 1: bolts 11-22 19 ft. lbs.
7- Step 1: 20 ft. lbs.
8- Step 1: 31 ft. lbs.
9- 83 inch lbs.
10- Stud bolt: 11 ft. lbs.
11- Step 1: 72 ft. lbs.
12- Bolts: 17-24 (M8) 16 ft. lbs.
13- Step 1: 33 ft. lbs.
14- Intake manifold collector:
15- Intake manifold:
TORQUE SPECIFICATIONS
all readings in ft. lbs. Year Engine ID Engine Displacement Liters Cylinder Head Bolts Main Bearing Bolts Rod Bearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Spark Plugs Oil Pan Drain Plug Intake Exhaust 2005 QR25DE VQ40DE
1- Step 1: 22 ft. lbs.
2- 10-12 ft. lbs. plus 60-65 degrees or 28-33 ft. lbs.
3- The cylinder heads and the lower intake manifold are installed together
4- 10-12 ft. lbs. +60-65 degrees
5- Step 1: 72 ft. lbs.
6- Step 1: bolts 11-22 19 ft. lbs.
7- Step 1: 20 ft. lbs.
8- Step 1: 31 ft. lbs.
9- 83 inch lbs.
10- Stud bolt: 11 ft. lbs.
11- Step 1: 72 ft. lbs.
12- Bolts: 17-24 (M8) 16 ft. lbs.
13- Step 1: 33 ft. lbs.
14- Intake manifold collector:
15- Intake manifold:
Main Bearing Torque Sequence




Fig. Main bearing torque sequence-2.4L engine



Fig. Main bearing torque sequence-2.5L engine



Fig. Main bearing torque sequence-3.3L engine



Fig. Main bearing torque sequence-4.0L engine
0helpful
1answer

Torque Settings For Mazda WL Turbo Engine

TORQUE SPECIFICATIONS all readings in ft. lbs.

This for 2000 model I do not know the yuear of your car.

Year Engine Displacement Liters Engine VIN Cylinder Head Bolts Main Bearing Bolts Rod Brearing Bolts Crankshaft Damper Bolts Flywheel Bolts Manifold Intake Exhaust Spark Plugs Oil Pan Drain Plug 2000 2.5 C ? ? ? 103-133 54-64 3.0 U ? 60 26 107 54-64 4.0 X ? 66-77 19-24 ? 59


0helpful
1answer

Need head bolt torque specs for a 1996 saturn sl

Quote:





Originally Posted by norvelplagbao52

1993 saturn sl2 1.9 dohc cylinder head torque
specs and sequence
Cylinder head bolt
tightening procedure:
CYLINDER HEAD BOLT TIGHTENING SEQUENCE:

INTAKE
SIDE
8 4 1 5 9

7 3 2 6 10
EXHAUST SIDE

In sequence,
torque the cylinder head bolts. Torque: 30 Nm (22 ft-lbs).
In sequence,
torque all bolts. Torque: 50 Nm (37 ft-lbs)
In sequence, turn each bolt an
additional 90 degrees.





Originally Posted by norvelplagbao52

1993 saturn sl2 1.9 dohc cylinder head torque
specs and sequence
Cylinder head bolt
tightening procedure:
CYLINDER HEAD BOLT TIGHTENING SEQUENCE:

INTAKE
SIDE
8 4 1 5 9

7 3 2 6 10
EXHAUST SIDE

In sequence,
torque the cylinder head bolts. Torque: 30 Nm (22 ft-lbs).
In sequence,
torque all bolts. Torque: 50 Nm (37 ft-lbs)
In sequence, turn each bolt an
additional 90 degrees.
0helpful
2answers

2001 daewoo lanos dual overhead 1.6 liter head bolt torque and sequence

  1. Tighten cylinder head bolts to 25 N.m (18 ft. lbs.). Tighten bolts an additional 70 degrees plus 70 degrees plus 30 degrees using angular torque gauge .
2001-daewoo-lanos-dual-overhead-1-6-vrq3bch1e30nz1jlq5sn5nnt-4-0.gif
1helpful
2answers

I have been told that you have to replace the head bolts when replacing the head gasket because the bolts will stretch. Is this true?

If you change the head bolts that's the safest bet for trouble free operation. But, I've changed head bolts on Hondas for years and they never stretched. I know this is for a Kia. My best guess is that it's not necessary since the Chilton based manuals don't say to do this.

If the head is torqued down to specifications and it leaks, then I would say, otherwise. Even torque is more important than bolt stretch, especially if the bolts don't stretch so much that the head gasket can't be tight against the head and block.
3helpful
1answer

Need cylinder head torque specifications 2004 hyundai elantra

Install the cylinder head bolts. Starting at top center, tighten all cylinder head bolts in sequence as shown in illustration, using the Cylinder Head Bolt Wrench (09221 - 32001) or equivalent. Repeat the procedure, re-tightening all cylinder head bolt to the specified torque. (torque spec is Cold Engine 105-115 Nm (76-83 ft lb) )
. Install the timing belt tensioner pulley.
. Install the timing belt on the camshaft sprocket, making sure that the tension side is tightened by turning the camshaft sprocket in reverse, all timing marks are in alignment.
. Adjust the timing according to "Timing Belt"
. Install the rocker cover and tighten the bolts to the specified torque. Tightening torque: Rocker cover belt:

2.5-3.5 Nm (25-35 kg.cm, 2-3 ft. lbs.)

. Install the timing belt cover.
Install the new intake manifold gasket and the intake manifold. Tighten the nuts and bolts to the specified torque.
Install the new exhaust manifold gasket and the exhaust manifold. Tighten the exhaust manifold attaching nuts to the specified torque.
. Install the surge tank and tighten the nuts bolts to the specified torque.
. Install the power steering oil pump and bracket.
. Install the ignition coil.
. Install the air intake hose.
Connect the vacuum hose, fuel hose and water hose.
. Install breather hose.
1helpful
3answers

How do I remove the head? (Blown Head gasket)

prev.gif next.gif Cylinder Head REMOVAL & INSTALLATION 2.3L Engine
  1. Properly relieve the fuel system pressure.
  2. Disconnect the negative battery cable, then drain cooling system into a suitable container.
  3. Detach the heater inlet and throttle body heater hoses from water outlet. If accessible at this time, disconnect the upper radiator hose from the water outlet.
  4. Remove the exhaust manifold. For details, please refer to the procedure located in this section.
  5. Remove the intake (camshaft housing for SOHC) and exhaust (DOHC only) camshaft housings.
  6. Unfasten the oil fill tube bolt/screw then remove the oil fill cap and level indicator assembly. Pull the oil fill tube upward to unseat from block.
  7. Label and disengage the injector harness electrical connector.
  8. Detach the throttle body-to-air intake duct.
  9. Tag and disconnect the power brake vacuum hose from the throttle body.
  10. Remove the throttle cable bracket.
  11. Remove the throttle body from the intake manifold with the electrical harness and throttle cable attached and position the assembly aside.
  12. Tag and disconnect the MAP sensor vacuum hose from the intake manifold, then remove the intake manifold brace.
  13. Detach the electrical connectors from the MAP sensor, IAT sensor and the EVAP canister purge solenoid.
  14. If not already done, detach the upper (inlet) radiator hose from the water outlet.
  15. Disengage the coolant temperature sensor connector(s).
  16. Unfasten the cylinder head bolts in reverse order of the installation sequence shown in the accompanying figures.
  17. Lift the cylinder head from the engine block. Remove and discard the gasket. Inspect the oil flow check valve for freedom of movement.
  18. Using a suitable solvent, thoroughly clean and dry all bolts, bolt holes and mating surfaces. Inspect the head bolts for any damage and replace, if necessary. If using a scraper to clean the old gasket material from the mating surfaces, use only a plastic or wood one, NOT a metal scraper. Do NOT allow any debris to fall into the engine! To install:
  19. Place a new cylinder head gasket on the cylinder block, then carefully position the cylinder head in place.
  20. Sparingly coat the head bolt threads with clean engine oil, then allow the oil to drain off before installing.
  21. On 1988-89 engines, install and tighten the cylinder head bolts, in sequence, as follows:
    • Step 1 - Tighten all head bolts in sequence to 26 ft. lbs. (35 Nm)
    • Step 2 - Using a torque angle meter, tighten the short bolts an additional 80°and the long bolts an additional 90°in sequence Fig. 5: Cylinder head bolt tightening sequence - 1988-89 2.3L engine 86883121.gif
  22. On 1990-91 engines, tighten the cylinder head bolts, in sequence, as follows:
    • Step 1 - Tighten all head bolts in sequence to 26 ft. lbs. (35 Nm)
    • Step 2 - Using a torque angle meter, tighten the short bolts an additional 100°and the long bolts an additional 110°in sequence Fig. 6: Cylinder head bolt tightening sequence - 1990-91 2.3L engine 86883122.gif
  23. On 1992 engines, tighten the cylinder head bolts, in sequence, as follows:
    • Step 1 - Tighten, in sequence, head bolts 1-6 to 26 ft. lbs. (35 Nm), 7-8 to 15 ft. lbs. (20 Nm) and 9-10 to 22 ft. lbs. (30 Nm).
    • Step 2 - Tighten all head bolts, in sequence, an additional 90°using J 36660 or equivalent
    • Step 3 - In sequence, loosen each bolt one turn, then immediately re-tighten to the specified torque
    • Step 4 - After completing step 3 on all 10 bolts, tighten each bolt, in sequence, an additional 90° Fig. 7: Cylinder head bolt tightening sequence - 1992 2.3L engine 86883123.gif
  24. On 1993-95 vehicles, tighten the cylinder head bolts to the specifications shown in the accompanying figures. Fig. 8: Cylinder head bolt tightening sequence and specifications - 1993 2.3L engine 86883124.gif
    Fig. 9: Cylinder head bolt tightening sequence and specifications - 1994-95 2.3L engine 86883125.gif
  25. Engage the coolant temperature sensor electrical connector(s).
  26. Connect the upper radiator hose to the water outlet.
  27. Install the intake manifold bracket.
  28. Attach the following electrical connections: MAP sensor, IAT sensor, and the purge solenoid.
  29. Using a new gasket, install the throttle body to the intake manifold.
  30. Install the accelerator control cable bracket.
  31. Connect the throttle body-to-air intake duct.
  32. Install the oil fill tube and level indicator.
  33. Install the camshaft housing(s).
  34. Install the exhaust manifold. For details, please refer to the procedure located in this section.
  35. Connect the heater inlet and throttle body heater hoses to the water outlet.
  36. Fill all fluids to their proper levels.
  37. Connect the battery cable, start the engine and check for leaks.
3helpful
3answers

I'm looking for the Head Bolt torque specs for a 2005 dodge stratus 2.7L

STEP 1 TORQUE BOLTS 1 - 8 - 35 FT LBS STEP 2 TORQUE BOLTS 1 - 8 - 50 FT LBS STEP 3 TORQUE BOLTS 1 - 8 -50 FT LBS STEP 4 TORQUE BOLTS 1 - 8 - PLUS 1/4 TURN STEP 5 TORQUE BOLTS 9 - 11 21 FT LBS.
5helpful
2answers

Torque specification on a 2003 alero cylinder heads 3.4 liter

3.4L Engine To Remove:
  1. Remove the lower intake manifold.
  2. Remove the exhaust crossover pipe.
  3. If removing the right cylinder head, remove the catalytic converter from exhaust manifold.
  4. If removing the left cylinder head, remove the engine oil dipstick and tube.
  5. Remove the rocker arms and pushrods.
  6. Remove and discard the cylinder head bolts.
  7. Remove the cylinder head.
  8. Clean the mating surfaces on the following items:
    • Cylinder head
    • Cylinder block
    • Intake manifold
  9. Clean the cylinder block bolt threads.
NOTE: During disassembly, keep the valve train components together for proper location during assembly.
To Install:
NOTE: Coat the cylinder head bolt threads using thread sealer.
  1. If removed, install the following components:
    • Exhaust manifold
    • Accessory studs
    • Spark plugs
  2. Place the cylinder head gasket in position over the dowel pins. Ensure that the THIS SIDE UP note is showing.
  3. Install the cylinder head. Cylinder head torque sequence ’99-‘00 gmpc_v6_14.gif

    Cylinder head torque sequence ’01-05 gm-03-34-682.gif

  4. Install the new cylinder head bolts.
    • Tighten the cylinder head bolts a first pass to 44 ft lb (60 Nm).
  5. Tighten the cylinder head bolts in sequence an additional 95 degrees.
  6. Install the intake gasket.
  7. Install the pushrods and rocker arms.
  8. Raise and support the vehicle.
  9. Install the catalytic converter and dipstick tube and indicator if removed.
  10. Lower the vehicle.
  11. Install the exhaust crossover pipe.
  12. Install the intake manifolds.
  13. Connect negative battery cable.
  14. Fill the cooling system.
Not finding what you are looking for?

158 views

Ask a Question

Usually answered in minutes!

Top Chevrolet Experts

ZJ Limited
ZJ Limited

Level 3 Expert

17989 Answers

john h

Level 3 Expert

29494 Answers

Thomas Perkins
Thomas Perkins

Level 3 Expert

15088 Answers

Are you a Chevrolet Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...