SETTING WEEKLY EXERCISE CYCLE
The generator will start and exercise once every
seven (7) days, on a day and at a time of day selected
by the installer or operator. The unit will run for
approximately 13-15 minutes during this "exercise"
cycle, and will then shut down. Transfer of electrical
loads to the "standby" power source will not occur
during the exercise.
A switch located on the generator control console permits
the day and time of exercise to be selected. To
select the day and time of day for the system to exercise,
proceed as follows:
• Place the AUTO-OFF-MANUAL switch to its OFF
position.
• Hold the set exercise time switch at its ON position
for about five (5) seconds.
• After five seconds, release the set exercise time
switch to its OFF position. Wait 30 seconds, then
place the AUTO-OFF-MANUAL switch at AUTO.
The generator will exercise every seven (7) days at
the selected time.
NOTE: Failure to wait 30 seconds before placing
the AUTO-OFF-MANUAL switch to AUTO may
result in engine cranking and startup. If the
engine does crank and start, it will shut-down
automatically within about two (2) minutes
If it still does not work... Check the Utility Power line transformer resistances in the transfer switch. Also check the terminal board in the transfer switch for any corrosion or signs of heat.
All Terminals connections N1, N2, T1, T2, E1, & E2 should be tight and clean.
If you need more assistance just respond here and I will help you.
Kelly
29 questions posted
Usually answered in minutes!
4 Questions