1994 Hyundai Sonata Logo
Posted on Oct 26, 2009

What sequence to remove head of 1994 sonata - 1994 Hyundai Sonata

1 Answer

Anonymous

Level 1:

An expert who has achieved level 1.

  • Contributor 2 Answers
  • Posted on Sep 05, 2010
Anonymous
Contributor
Level 1:

An expert who has achieved level 1.

Joined: Sep 05, 2010
Answers
2
Questions
0
Helped
269
Points
2

Add Your Answer

×

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

1helpful
1answer

What is the torque settings on a 3.4 liter engine 94 camaro. replaced the heads and gaskets

Torque sequence --------- ' 6 2 3 7 ' ' 5 1 4 8 ' --------- Step 1: torque in sequence to 33 Ft/Lbs Step 2: turn an additional 90 degrees Recheck final torque in sequence *** CAUTION ***engine uses Torque To Yield head bolts (TTY) thatpermanently stretch during the initial installation.New head bolts must be used when cylinder head isreplaced or re-installed to obtain proper torque.

I hope this helps you and good luck
1helpful
3answers

How do I remove the head? (Blown Head gasket)

prev.gif next.gif Cylinder Head REMOVAL & INSTALLATION 2.3L Engine
  1. Properly relieve the fuel system pressure.
  2. Disconnect the negative battery cable, then drain cooling system into a suitable container.
  3. Detach the heater inlet and throttle body heater hoses from water outlet. If accessible at this time, disconnect the upper radiator hose from the water outlet.
  4. Remove the exhaust manifold. For details, please refer to the procedure located in this section.
  5. Remove the intake (camshaft housing for SOHC) and exhaust (DOHC only) camshaft housings.
  6. Unfasten the oil fill tube bolt/screw then remove the oil fill cap and level indicator assembly. Pull the oil fill tube upward to unseat from block.
  7. Label and disengage the injector harness electrical connector.
  8. Detach the throttle body-to-air intake duct.
  9. Tag and disconnect the power brake vacuum hose from the throttle body.
  10. Remove the throttle cable bracket.
  11. Remove the throttle body from the intake manifold with the electrical harness and throttle cable attached and position the assembly aside.
  12. Tag and disconnect the MAP sensor vacuum hose from the intake manifold, then remove the intake manifold brace.
  13. Detach the electrical connectors from the MAP sensor, IAT sensor and the EVAP canister purge solenoid.
  14. If not already done, detach the upper (inlet) radiator hose from the water outlet.
  15. Disengage the coolant temperature sensor connector(s).
  16. Unfasten the cylinder head bolts in reverse order of the installation sequence shown in the accompanying figures.
  17. Lift the cylinder head from the engine block. Remove and discard the gasket. Inspect the oil flow check valve for freedom of movement.
  18. Using a suitable solvent, thoroughly clean and dry all bolts, bolt holes and mating surfaces. Inspect the head bolts for any damage and replace, if necessary. If using a scraper to clean the old gasket material from the mating surfaces, use only a plastic or wood one, NOT a metal scraper. Do NOT allow any debris to fall into the engine! To install:
  19. Place a new cylinder head gasket on the cylinder block, then carefully position the cylinder head in place.
  20. Sparingly coat the head bolt threads with clean engine oil, then allow the oil to drain off before installing.
  21. On 1988-89 engines, install and tighten the cylinder head bolts, in sequence, as follows:
    • Step 1 - Tighten all head bolts in sequence to 26 ft. lbs. (35 Nm)
    • Step 2 - Using a torque angle meter, tighten the short bolts an additional 80°and the long bolts an additional 90°in sequence Fig. 5: Cylinder head bolt tightening sequence - 1988-89 2.3L engine 86883121.gif
  22. On 1990-91 engines, tighten the cylinder head bolts, in sequence, as follows:
    • Step 1 - Tighten all head bolts in sequence to 26 ft. lbs. (35 Nm)
    • Step 2 - Using a torque angle meter, tighten the short bolts an additional 100°and the long bolts an additional 110°in sequence Fig. 6: Cylinder head bolt tightening sequence - 1990-91 2.3L engine 86883122.gif
  23. On 1992 engines, tighten the cylinder head bolts, in sequence, as follows:
    • Step 1 - Tighten, in sequence, head bolts 1-6 to 26 ft. lbs. (35 Nm), 7-8 to 15 ft. lbs. (20 Nm) and 9-10 to 22 ft. lbs. (30 Nm).
    • Step 2 - Tighten all head bolts, in sequence, an additional 90°using J 36660 or equivalent
    • Step 3 - In sequence, loosen each bolt one turn, then immediately re-tighten to the specified torque
    • Step 4 - After completing step 3 on all 10 bolts, tighten each bolt, in sequence, an additional 90° Fig. 7: Cylinder head bolt tightening sequence - 1992 2.3L engine 86883123.gif
  24. On 1993-95 vehicles, tighten the cylinder head bolts to the specifications shown in the accompanying figures. Fig. 8: Cylinder head bolt tightening sequence and specifications - 1993 2.3L engine 86883124.gif
    Fig. 9: Cylinder head bolt tightening sequence and specifications - 1994-95 2.3L engine 86883125.gif
  25. Engage the coolant temperature sensor electrical connector(s).
  26. Connect the upper radiator hose to the water outlet.
  27. Install the intake manifold bracket.
  28. Attach the following electrical connections: MAP sensor, IAT sensor, and the purge solenoid.
  29. Using a new gasket, install the throttle body to the intake manifold.
  30. Install the accelerator control cable bracket.
  31. Connect the throttle body-to-air intake duct.
  32. Install the oil fill tube and level indicator.
  33. Install the camshaft housing(s).
  34. Install the exhaust manifold. For details, please refer to the procedure located in this section.
  35. Connect the heater inlet and throttle body heater hoses to the water outlet.
  36. Fill all fluids to their proper levels.
  37. Connect the battery cable, start the engine and check for leaks.
0helpful
1answer

Replacing Hydraulic Lifters

YOU HAVE TO REMOVE VALVE COVERS LOOSEN REMOVE ROCKER ARMS ASSEMBLY KEEP ROCKER ARM ASSEMBLY IN ORDER SO THEY GO BACK IN THE ORIGINAL POSITION.YOU HAVE TO REMOVE INTAKE MANIFOLD ALSO.YOU NEED A REPAIR MANUAL FOR TORQUE SEQUENCE ON THE INTAKE MANIFOLD AND ROCKER ARMS TORQUE.
6helpful
1answer

Need torque specs for 1994 ford escort 1.9 ltr head bolts

Torque new cylinder head bolts in sequence to 44 ft lb. Loosen bolts approximately two turns, then torque bolts in sequence to 44 ft lb. Turn bolts an additional 90 degrees in sequence, then an additional 90 degrees

Torque sequence
9 3 1 5 7
8 6 2 4 10
0helpful
1answer

Wanting to no how to take the head off a block of a 1994 acura vigor

SORRY TO SAY YOU NEED CHILTON IMPORT MANUAL OR HAYNES MANUAL. YOU NEED TO LOOK AT HEAD TORQUE SEQUENCE.AND THE TIMING BELT AND CAMSHAFT SPROCKETS CRANKSHAFT TIMING MARKS.YOU HAVE RIGHT MANY THINGS TO REMOVE TO GET CYLINDER HEAD OFF.THATS WHY REPAIR MANUAL WILL BE VERY HELPFUL.
0helpful
1answer

How do you repair a cylinder head gasket on a 1994 cavalier

you have to take the head off , i gather you mean the gasket..once removed got to check the head for cracks n warping but to rlace needs to be very clean both head and block .. the gasket normally comes with tightening sequence and torque settings
1helpful
2answers

Need to know cylinder head bolt torque specs

Head Bolt Torque For your 1994 Oldsmobile Cutlass Supreme (3.4L SFI DOHC): clearpixel.gif Foot pounds (Final torque) clearpixel.gif Note: Torque sequence --------- | 6 2 3 7 | | 5 1 4 8 | --------- Step 1: torque in sequence to 33 Ft/Lbs Step 2: turn an additional 90 degrees Recheck final torque in sequence *** CAUTION ***engine uses Torque To Yield head bolts (TTY) thatpermanently stretch during the initial installation.New head bolts must be used when cylinder head isreplaced or re-installed to obtain proper torque. clearpixel.gif clearpixel.gif clearpixel.gif Foot pounds (Final torque) clearpixel.gif Note: Torque sequence --------- | 8 4 1 5 | | 7 3 2 6 | front --------- of engine | 6 2 3 7 | | 5 1 4 8 | Step 1: torque to 40 Ft/Lbs --------- Step 2: turn an additional 90 degrees Recheck final torque in sequence *** CAUTION ***engine uses Torque To Yield head bolts (TTY) thatpermanently stretch during the initial installation.New head bolts must be used when cylinder head isreplaced or re-installed to obtain proper torque.
0helpful
1answer

94 GMC sonoma needs head gasket

no real pit falls just drain coolant remove head have head checked at machine shop. Clean engine surface good and rise good with brake clean, make sure head gasket is on correct before head goes on bolt down with proper torque and sequence then finish up then drain oil.
0helpful
1answer

Rear windows wont go down or up

your window regulator most likely
0helpful
1answer

Siezed engine in 1994 hyundai sonata 2 litre

hi i have sonata 2 1995 and the engine is nt turning on ,i checked the battery and the fuel ,i found them good but it is stil not working,will you please tell me what is the problem
Not finding what you are looking for?

233 views

Ask a Question

Usually answered in minutes!

Top Hyundai Experts

ZJ Limited
ZJ Limited

Level 3 Expert

17989 Answers

Thomas Perkins
Thomas Perkins

Level 3 Expert

15088 Answers

Brad Brown

Level 3 Expert

19187 Answers

Are you a Hyundai Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...